FASS
The Bassett Army Hospital facility manager spent $125,000 to install reels for accessing the ballasts in the lobby for future servicing of the lights, which are approximately 92 feet from the ground level. If reels had been designed in the conceptual phase and installed during construction, the cost would have been an estimated $25,000 - a savings of $100,000.

Download Image: Full Size (0.13 MB)
Photo by: Connie Storch, Fort Wainwright Public Affairs |  VIRIN: 070405-A-UK000-001.JPG