ESPC offers multitude of intangible benefits
An energy savings performance contract at Aberdeen Proving Ground, Maryland, added a cooling tower to support two 750-ton chillers to operate 24x7x365 in a surety laboratory. The chiller is one element of the project that will help the installation Directorate of Public Works improve overall efficiencies and generate actual savings to the government.

Download Image: Full Size (0.43 MB)
Tags: ESPC, ENERGY
Photo by: Jeffery Presgraves |  VIRIN: 140724-A-GR611-001.JPG