Range and Training Land Program

The Bassett Army Hospital facility
manager spent $125,000 to install
reels for accessing the ballasts in the
lobby for future servicing of the lights,
which are approximately 92 feet from
the ground level. If reels had been
designed in the conceptual phase and
installed during construction, the cost
would have been an estimated $25,000
- a savings of $100,000.
161116-A-UK000-001.JPG Photo By: Amy Newcomb

Nov 16, 2016
Huntsville, Alabama - The Bassett Army Hospital facility manager spent $125,000 to install reels for accessing the ballasts in the lobby for future servicing of the lights, which are approximately 92 feet from the ground level. If reels had been designed in the conceptual phase and installed during construction, the cost would have been an estimated $25,000 - a savings of $100,000.


DOWNLOAD PHOTO (0.02 MB)


This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at http://www.dimoc.mil/resources/limitations.html , which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.



Back to Gallery

Divisions

Planning  256-895-XXXX

Site Development  256-895-XXXX

Programming  256-895-XXXX

Design 256-895-XXXX